Tel: +353 (0) 51 364054Tel: +44 (0) 207 9232266
Wind Turbine Installation
Wind turbine installation: Picture case studyWind Turbine foundations are laid:
Wind turbine pedestal

Concrete is poured into the wind turbine foundations
Close up of the wind turbine's nuts and bolts

Wind turbine erection

The second and third sections of the wind turbine tower are lifted into place
The wind turbine blades are positioned
Finished wind turbine

