-
Wind Turbine Instalation Ireland - Codd MushroomsEnerpower installed a 160KW WindWorld wind turbine, with a hub height of 31 meters and a blade diameter of 24m, which allows Codd Mushrooms to generate 275,000kwh of electricity per year to power their site.
-
ESCO Ireland, Burnell GreenEnerpower are contracted to meter monitor and bill each residential unit according to the number of kWh of energy they use. In addition Enerpower also provide maintenance of the heating system.
-
District Heating Carlinn HallCategory: General, District HeatingResidents at Carlinn Hall enjoy space heating and hot tap water which is provided by a central biomass district heating system.
-
Biomass Boiler Installation EPAThe E.P.A. Regional Inspectorate installed a Gilles 240kw Wood pellet boiler to heat their offices and laboratory in Inishcarra, County Cork.
-
Biomass Boiler, Forest Park Leisure CentreForest Park Leisure Centre installed a Gilles 550KW wood chip boiler because it is carbon neutral and it offers savings of €35,000 per year on there existing oil heat energy bill.
Case studies
homeCase studies

